The anomaly in the PSLV-62 launch occurred when the third stage of the vehicle was operating
Third stage PS3 ignites
4 minutes 25 seconds after liftoff
vehicle starts spinning in an uncontrollable way by round
2 minutes into third stage
ISRO reports trouble receiving data by the 12-minute mark
Monday's failure is the fourth since the PSLV's first mission in 19993 and second within in a year
September 20, 1993
PSLV-D1 the first mission of the vehicle fails to place the IRS-1E satellite in orbit
August 31, 2017: PSLV-C39 launch fails with malfunction in heat shield separation
May 18, 2025:PSLC-C61 launch fails with an incident in the third stage
No comments:
Post a Comment